Well dimensioning / calculation (please fill in the yellow cells / or choose from the pull down menues)(* Mandatory)

Customer Information
1) Borehole (depth x Ø)
2) no. of aquifers (depth in m - pls enter min./max. depth)
3) Piezometers (length)
4) well construction (tick box)
5) casing pipe (section 1)
6) screen pipes (section 1)

+ If a 2nd section is needed pls. click the "+" to the left and insert values.

9) crossovers/fittings (if needed)
10) connections (casings / screen pipes)
11) sump (tail) pipe/well bottom
12) Zentrierung/centralizer
13) well heads
14) riser pipes (tick box)
15) connections (riser pipe)
16) Pump
17) Installation tools
18) drilling additives
19) backfill materials
Suggestion GWE
Compactonit* 0.00 1 m3 = 1000 kg
Quellon HD kg/m 0.00 1 m3 = 1400 kg
Troptogel B kg/m 0.00 1 m3 = 520 kg Troptogel B + 800 ltr. wasser
Dämmer kg/m 0.00 1 m3 = 847 kg Dämmer + 694 ltr. Wasser
Thermoseal kg/m 0.00 1 m3 = 1100 kg
Gravel each m in kg 0.00 1 m3 = 1600 kg
qty. Geotherm Plus 1.0 each m kg 0.00 1 m3 = 858 kg Geotherm + 686 ltr. Wasser
Geotherm 2.0 kg/m 0.00 1 m3 = 823 kg Geotherm + 658 ltr. Wasser