Close
Requirements
Well dimensioning / calculation (please fill in the yellow cells / or choose from the pull down menues)(
*
Mandatory)
Customer Information
Customer name
*
Cust. no.
E-Mail
*
1) Borehole (depth x Ø)
depth (m)
*
Ø (DN)
*
no./qty.
*
drilling system
*
2) no. of aquifers (depth in m - pls enter min./max. depth)
water level(static -min.)
*
water level(static -max.)
*
water level(dynamic)
*
1st
2nd
3rd
3) Piezometers (length)
no./qty.
*
1st
2nd
3rd
4) well construction (tick box)
choose material
*
5) casing pipe (section 1)
material
*
Ø (ID)
*
Ø (OD)
*
total m
*
no/qty
*
length(m)
*
6) screen pipes (section 1)
material
Ø (ID)
Ø (OD)
slot size
total m
no/qty
length(m)
+
If a 2nd section is needed pls. click the "+" to the left and insert values.
7) casing pipe (section 2)
material
Ø (ID)
Ø (OD)
total m
no/qty
length(m)
8) screen pipes (section 2)
material
Ø (ID)
Ø (OD)
slot size
total m
no/qty
length(m)
9) crossovers/fittings (if needed)
from DN
from DN
OR
from (OD)
from (OD)
from DN
from DN
from (OD)
from (OD)
from DN
from DN
from (OD)
from (OD)
10) connections (casings / screen pipes)
PVC
Inox (SS)
GRP (fiberflass)
PE
11) sump (tail) pipe/well bottom
sump pipe
material
Ø (OD)
length
pcs.
Art. Code
bottom cap
material
Ø (OD)
length
pcs.
Art. Code
12) Zentrierung/centralizer
Centralizer 1
material
Ø (ID)
Ø (OD)
no./qty.
every meter
Centralizer 2
material
Ø (ID)
Ø (OD)
no./qty.
every meter
Centralizer 3
material
Ø (ID)
Ø (OD)
no./qty.
every meter
Centralizer 4
material
Ø (ID)
Ø (OD)
no./qty.
every meter
13) well heads
material
Ø (ID)
Ø (OD)
no./qty.
Ø (riser pipe)
steel quality
well head casing
Connection to distribution pipe
Connection to riser pipe
no. of monitoring pipes
14) riser pipes (tick box)
material
Ø (ID)
Ø (OD)
length(m)
no./qty.
steel quality
15) connections (riser pipe)
if PVC
if INOX
if galvanized
if Hagulit
if PE
16) Pump
If there is a pump available already on site, then please specify technical features of the pump in the text fields
Minimum details needed:
- model
- performance in m
3
/h
- total head
- Installation depth
- Ø riser pipe in inch
- Type of rp connection
m³/h
total head
install depth(m)
Voltage
freq (Hz)
in case pump already available on site define:
inch. / type of connection to raiser pipe:
inch. / type of cable connection:
17) Installation tools
tool 1
tool 2
tool 3
tool 4
18) drilling additives
additiv 1
additiv 2
further
19) backfill materials
material
size
qty. in cbm
material
size
qty. in cbm
material
size
qty. in cbm
further materials
material
size
qty. in cbm
Suggestion GWE
Compactonit*
0.00
1 m3 = 1000 kg
Quellon HD kg/m
0.00
1 m3 = 1400 kg
Troptogel B kg/m
0.00
1 m3 = 520 kg Troptogel B + 800 ltr. wasser
Dämmer kg/m
0.00
1 m3 = 847 kg Dämmer + 694 ltr. Wasser
Thermoseal kg/m
0.00
1 m3 = 1100 kg
Gravel each m in kg
0.00
1 m3 = 1600 kg
qty. Geotherm Plus 1.0 each m kg
0.00
1 m3 = 858 kg Geotherm + 686 ltr. Wasser
Geotherm 2.0 kg/m
0.00
1 m3 = 823 kg Geotherm + 658 ltr. Wasser
Send Mail