Senayan Square - Jakarta, Indonesia
Bauer's Asia-Pacific network extends from India to New Zealand. It includes a specialist foundation engineering subsidiary in Indonesia, here working on foundations in Jakarta. |
 |
 |
 |
|
Download
|
3,47 MB
|

|
 |
|
Zip-Datei
|
.tif (CMYK/300 dpi)
.jpg (RGB/72dpi)
|
 |
|
 |
Rotterdam, Netherlands
Bauer Funderingstechniek executed 64 temporary anchors to hold the sheet pile wall for the cooling water inlet at the new E.ON power station in the Maasvlakte district of Rotterdam. In the second construction phase, working from two pontoons in the excavated pit, 368 GEWI piles were installed to provide protection against uplift and as foundations. |
 |
 |
 |
|
Download
|
4,14 MB
|

|
 |
|
Zip-Datei
|
.tif (CMYK/300 dpi)
.jpg (RGB/72dpi)
|
 |
|
 |
Bridge foundation - Montreal, Canada
For the Nouvelle Autoroute 30 highway in Québec, bypassing to the west and south of Montreal, the Canadian subsidiary BAUER Foundations Canada Inc. constructed the foundations for the Beauharnois Bridge and drilled a total of 138 piles in the ultra-hard rock. |
 |
 |
 |
|
Download
|
4,36 MB
|

|
 |
|
Zip-Datei
|
.tif (CMYK/300 dpi)
.jpg (RGB/72dpi)
|
 |
|
 |
Tottenham Court Road Station - London, Great Britain
British Group subsidiary BAUER Technologies Ltd. is working as part of a joint venture on the development of Tottenham Court Road Station in London. |
 |
 |
 |
|
Download
|
5,18 MB
|

|
 |
|
Zip-Datei
|
.tif (CMYK/300 dpi)
.jpg (RGB/72dpi)
|
 |
|
 |
Louvre Museum - Abu Dhabi, U.A.E.
A sound footing for art treasures: In Abu Dhabi Bauer is providing the foundations for the offshoot of the Louvre. |
 |
 |
 |
|
Download
|
3,46 MB
|

|
 |
|
Zip-Datei
|
.tif (CMYK/300 dpi)
.jpg (RGB/72dpi)
|
 |
|
 |
Lake Okeechobee - Florida, USA
The CSM process developed by Bauer impressed in remediation work on the Herbert-Hoover-Dike in Florida. |
 |
 |
 |
|
Download
|
3,37 MB
|

|
 |
|
Zip-Datei
|
.tif (CMYK/300 dpi)
.jpg (RGB/72dpi)
|
 |
|
 |
Kocher quarter - Schwaebisch Hall, Germany
In Schwaebisch Hall Bauer is constructing a complex excavation pit for the Kocher quarter. |
 |
 |
 |
|
Download
|
3,04 MB
|

|
 |
|
Zip-Datei
|
.tif (CMYK/300 dpi)
.jpg (RGB/72dpi)
|
 |
|
 |
Mittlerer Ring - Munich, Germany
Tunnelling on the Mittlerer Ring: Bauer will be working on the foundations for the road tunnel – which is almost three kilometres long and in places has two levels – in the south-west of Munich through to 2013. |
 |
 |
 |
|