Foundation Work Nova Vida
Nova Vida, Luanda, Angola, Africa
BAUER Angola Lda is executing pile foundations for 32 buildings with 4 and/or 6 storeys each. The contract was awarded by the Angolan govern-
ment. For each building between 172 and 262 BAUER ductile piles with a bearing capacity of 40 t was installed. A static load test confirmed an ulti-
mate load of 110 t. Every week the pile foundation of one building was finished. With the MBG 12 we installed in total a length of 50,000 lin.m.
