Excavation Pit Highrise tower in the Central District
Highrise tower in the Central District, Beirut, Lebanon
In the Central District of Beirut, Bauer Lebanon executed the excavation pit for a high-rise building close to the ocean. Protected by the anchored pile wall with a grout blanket, the excava-
tion was executed to a depth of 21 metres – meaning 16 metres below sea level – with continuous dewatering.
