Cut-Off Walls Flood Protection Mauthausen

Flood Protection Mauthausen, Austria

In Mauthausen – near Perg, the twin town of Schrobenhausen – a 1.8 kilometre long static cut-off wall was constructed by the MIP method at a depth of 5.6 metres for the largest flood protection project in Austria. 1,250 steel sections for mobile flood protection elements were installed in the MIP trench.