Off-site decontamination via selective excavation through soil replacement drilling
![]() |
On the premises of a chemical factory nearby Leipzig massive soil and ground water contamination has been proven in the area of a former chlorobenzene production. The target of the decontamination measures is to reduce the soil contamination to protect the ground water and to decrease the solvent evaporation potential. The chosen decontamination option consists of two parts: soil replacement via large diameter drilling on the one hand, and hydraulic measures for the recovery of chlorobenzene from the ground water on the other hand. |
Nimr Water Treatment Project
![]() |
The project is bound to develop and set up an effective treatment plant for the residual waters produced from the Petroleum Development Oman (PDO) oil wells in its Nimr Oil Field with a capacity to process a minimum of 45,000 m3/day produced water.
|